Before choosing a modular home design for a Sydney property, prepare a clear picture of the site. Access, ground conditions, services and local planning requirements can all affect the next steps. This checklist helps you gather useful information for a first site conversation; it does not determine whether a particular project can be approved.
1. Put the site information in one place
Record the address, approximate lot dimensions, slope, existing buildings, significant trees and any obvious easements or difficult areas. If you have a recent survey or site plan, keep it with your photos. Mark the proposed building area on a copy rather than relying on memory.
2. Review the route from the street to the building area
Photograph the driveway, street frontage, gates, overhead lines, tight turns and likely installation area. Delivery and lifting methods depend on the module and the site. Ask a qualified delivery or installation team to assess access before assuming a layout can be transported or placed there.
3. Locate service connections
Identify where water, sewer, electricity and communications enter the property. Ask qualified trades or the relevant providers to assess capacity, connection routes and possible upgrades. A concept layout alone cannot confirm the cost or feasibility of those connections.
4. Locate underground services before any excavation
Before ground works, ask the builder or excavator to request current underground network information through Before You Dig Australia (BYDA). BYDA recommends a free enquiry even for work on private property. It is a starting point for locating registered network assets, not a substitute for a qualified on-site locator when the plans or conditions call for one. Keep the responses with the survey and give them to the people planning foundations, trenching and service routes.
5. Check Sydney Water approvals separately from connection work
Sydney Water says granny flats are among the projects requiring building plan approval before work starts. Its process begins with checking the location of pipes, structures and easements; it points owners to free Sydney Water asset plans through BYDA. Ask whether the proposed footprint affects an asset and who will submit the plans through Sydney Water Tap in. Council or certifier approval does not remove this separate Sydney Water check.
If the project needs a new water or wastewater connection, confirm the connection application and conditions as another workstream. Sydney Water says a new connection first needs building plan approval and may also need a Section 73 Compliance Certificate. Have the licensed plumber or relevant provider identify the connection scope and any inspections; do not assume an existing house connection can simply be extended. Include these tasks and possible fees in the site discussion.
6. Confirm the planning pathway for this property
Requirements vary by site and proposal. The NSW Government guide to the development application process explains the DA pathway and notes that secondary dwellings are among the small residential projects it covers. Check the current rules with your local council or a qualified planning professional before treating any design as approved. For a first screening of a granny flat proposal, read our Sydney granny flat land checklist.
7. Ask for a scope that separates knowns from assumptions
Bring the survey, photos, your intended use, preferred layout and budget range to the first discussion. Ask which site works, delivery tasks, service connections, design services and approval steps are included in any indicative scope, and which still require inspection or specialist advice. Record the unanswered questions so the next estimate can be more precise.