These diagrams show an indicative rapid-build sequence from prefabricated steel components to assembled wall, roof and floor systems. They are a visual introduction; final details are determined for the project.
Modular structural concept
Light-gauge framing, a hybrid structural concept and prefabricated wall modules are shown as complementary approaches to off-site preparation and site assembly.

Wall build-up
A typical illustrated sequence starts with a steel-stud frame, adds a structural or sheathing board, then a breathable weather membrane and external cladding or cement board. The exact layers vary by specification.

Wall module installation
Reference photos show the steel-stud frame, preparation of an integrated wall module and assembly on site.

Roof build-up
The illustrated roof options begin with a triangular steel truss, add prefabricated OSB and an SBS waterproofing membrane where specified, then finish with roof tiles or another approved covering.


Floor panels
Single-truss floor members and assembled floor panels are illustrated as prefabricated options to simplify site installation.

See installation in motion
Watch the four-part Installation Guide on the AIVEO homepage for a visual introduction to the build process.
Material specifications, test references and project imagery are illustrative source-proposal information. Confirm current product documents, engineering and project suitability before selection.